TSC cooperates with county and city governments in the planning of industrial parks and provides a total of 2,561.63 hectares of land in a cooperative development model.
-
The land provided to the local governments for the planning of industrial parks in 2019 included the following 11 pieces of land with the area totaling 992.83 hectares.
- Taichung City:
(2) Third Phase of Precision Machinery Innovation Technology Park, with a total of 14.64 hectares (land allocation is tentatively set at 30% or more, still under planning).
- Changhua County:
(2) Datiecu (South side) Industrial Park, with a total of 5.16 hectares (land allocation is tentatively set at 30% or more, still under EIA).
(3) Erlin Precision Machinery Park, with a total of 342.04 hectares (land allocation is tentatively set at 30% or more, still under EIA).
- Yunlin County: Gukang Industrial Value-Added Park, with a total of 67.90 hectares (land allocation is tentatively set at 30% or more, still under EIA).
- Chiayi County: Mahouhou Industrial Park (Late Stage), with a total of 335.73 hectares (land allocation of 100.72 hectares, and contract signing has been completed).
- Tainan City: Green Energy Technology Park, with a total of 86.23 hectares (land allocation is tentatively set at 30% or more, still under planning).
- Kaohsiung City:
(2) Dalinpu New Material Circular Industrial Park, with a total of 43.51 hectares (will undergo the urban planning change and EIA).
- Pingtung County: Liu-Kui-Cuo Industrial Park, with a total of 19.75 hectares (land allocation of 5.96 hectares, and contract signing has been completed).
- In response to the return of Taiwanese businessmen, TSC cooperates with MOEA in the development of industrial parks, providing the following 10 pieces of land with a total area of 1,233.98 hectares.
- Provide 9 pieces of land with a total area of 1,204 hectares for the planning of industrial park development. The first stage is the short- and medium-term development area of 744 hectares of land, providing an area of 520.5 hectares of land for industrial use. The second stage is the long-term development area of 460 hectares, providing an area of 322 hectares of land for industrial use. Follow-ups will be coordinated with the policy in a cooperative development model with the Industrial Development Bureau.
- Provide the Export Processing Zone Administration an area of 29.98 hectares of land for the planning of the Pingtung Export Processing Zone Expansion Scheme. Follow-ups will be handled in a leasing model in accordance with the policy.
-
TSC cooperates with the Ministry of Science and Technology and provide the following 2 pieces of land with a total area of 334.82 hectares to Southern Taiwan Science Park (STSP).
- Approximately 244.01 hectares of land for the STSP Kaohsiung Second Science Park (Ciaotou) will be handled by section expropriation. Currently, the environmental impact assessment (EIA) related operations are handled by local authorities.
- Approximately 90.81 hectares of land expansion area for STSP Tainan Science Park (Shanhua) will be handled by section expropriation. Currently this project is under planning.